Scottish and Southern Energy use simSCADA for testing their SCADA system split

15 April 2010

As part of a restructure of their generation and distribution business, Scottish and Southern Energy is splitting their single system into two separate SCADA systems, and using an ICCP link to connect the two. SSE made extensive use of simSCADA to test the stability, data integrity and performance of the link between the two systems.